Categorical Exclusion Determinations: Savannah River Operations Office

Upgrade Room Exhaust Flow Path of HB-Line Confinement Ventilation System CX(s) Applied: B2.2 Date: 06/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office