Categorical Exclusion Determinations: Savannah River Operations Office

Provide an Improved Heating, Ventilation and Air Conditioning System in 705-A CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Well #ASH-06 Tie-In to A-Area Burning Rubble Pit (ABRP) Soil Vapor Extraction Unit (SVEU) CX(s) Applied: B6.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office