Categorical Exclusion Determinations: Savannah River Operations Office

Characterization of Building 690-N (Ford Building) and Ancillary Equipment CX(s) Applied: B3.1 Date: 12/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
9977 Receipt, Disassembly, Unloading and Reassembly of 9977 Shipping Containers in Material Balance Area A23 CX(s) Applied: B3.6 Date: 12/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Uninterrupted Power Supply Replacement for Certain Safeguards and Security Systems in K-Area Complex CX(s) Applied: B1.7 Date: 12/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fabricate/Install Tank 42 Temporary Purge Ventilation Stack HEPA Filter HTF-TMC-13-033 CX(s) Applied: B2.5 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office