Categorical Exclusion Determinations: Office of Petroleum Reserves

To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.
This emergency repair order is to engineer and install soil stabilization to stabilize the slope failure. Also, the main access road, electrical co…
Installing a new lift station capable of tying together all existing site lift stations and delivering a minimum of 5,000 gallons per day (GPD) of sewage approximately 3 miles to the Veolia Sewage Treatment Plant as well as demolishing the existing Sewage Treatment Plant.
Remove one deteriorated protective chain-link fencing system and reinstall a replacement system using all new material and hardware.…
Work in connection with the dredging of the raw water intake channel at the Department of Energy’s federal crude oil reserve site located at Bryan Mound.
For the Exchange for Storage Contracts, companies will deliver crude approximately 24mm barrels into all (4) SPR sites for a time period to be delivered back out at a later date.