Categorical Exclusion Determinations: Georgia

Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/25/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/18/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Smart Wire Grid, Inc. - Distributed Power Flow Control Using Smart Wires for Energy Routing CX(s) Applied: A9, B1.7, B3.6 Date: 02/17/2012 Location(s): California, Missouri, North Carolina, Georgia, Tennessee Offices(s): Advanced Research Projects Age...
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: A9, A11, B3.6, B5.23 Date: 02/16/2012 Location(s): Kentucky, Georgia Offices(s): National Energy Technology Laboratory
DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project CX(s) Applied: B5.22 Date: 01/27/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project CX(s) Applied: A1 Date: 01/26/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory