Categorical Exclusion Determinations: B5.5

Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Carbon Dioxide Capture By Cold Membrane Operation with Actual Coal-Fired Power Plant Flue Gas CX(s) Applied: A1, A9, B3.6, B5.5 Date: 01/28/2014 Location(s): CX: none, Delaware, Alabama, Pennsylvania, California Offices(s): National Energy Technology ...
Injecting Carbon Dioxide into Unconventional Storage Reservoirs in the Central Appalachian Basin... CX(s) Applied: B3.1, B5.3, B5.5, B5.13 Date: 09/09/2013 Location(s): Tennessee Offices(s): National Energy Technology Laboratory