Categorical Exclusion Determinations: B5.2

Reconfiguration Of Export Water System at 181-D under Project L-781 CX(s) Applied: B5.2 Date: 07/22/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters CX(s) Applied: B5.2 Date: 06/24/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office