Categorical Exclusion Determinations: B4.9

Orchard Tree Planting within North Bonneville-Ross No. 1 Transmission Line corridor - LURR 20150270 CX(s) Applied: B4.9Date: 12/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross-Lexington Transmission Line Corridor Lease for Horse Pasture and Garden CX(s) Applied: B4.9Date: 12/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Issuance of Easement Outgrant to Giving Life Ministries for a Parking Lot Expansion CX(s) Applied: B4.9Date: 10/15/2015 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region
Prescott-Pinnacle Peak Wireless Communications Equipment Installation at Structure 147/4 CX(s) Applied: B4.9Date: 10/09/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Approval of Land Use Review Request for Fiber Installation in BPA right-of-way in Skamania County, Washington CX(s) Applied: B4.9Date: 08/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Approval of Land Use Review Request for Underground Line Installation in a BPA Right-of-way in Washington County CX(s) Applied: B4.9Date: 07/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration