Categorical Exclusion Determinations: B4.3

Routine Activities CX(s) Applied: B1.3, B1.4, B1.6, B1.7, B1.9, B1.11, B1.16, B1.17, B1.20, B1.22, B1.23, B1.24, B1.25, B1.30, B1.34, B2.2, B2.3, B2.5, B4.1, B4.2, B4.3, B4.4, B4.6, B4.8, B4.10, B5.1, B5.6Date: 10/25/2015 Location(s): Multiple Location...
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
Pick-Sloan Missouri Basin Program- Eastern Division- Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
CRSP Rate Order No. WAPA-169 CX(s) Applied: B4.3Date: 02/25/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Colorado River Storage Project Management Center
Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project CX(s) Applied: B4.3 Date: 07/30/2012 Location(s): Texas, Texas, Texas Offices(s): Southwestern Power Administration
Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects CX(s) Applied: B4.3 Date: 10/20/2011 Location(s): CX: none Offices(s): Southwestern Power Administration
Renewal of Rates and Services for the Central Valley Project, the California-Oregon Transmission Project, the Pacific Alternating Current Intertie, and Path 15 Transmission - Rate Order Number Western Area Power Administration-156CX(s) Applied: B4.3Dat...
Power Rate Formula for the Provo River Project of the Western Area Power AdministrationCX(s) Applied: B4.3Date: 10/26/2009Location(s): ColoradoOffice(s): Western Area Power Administration-Colorado River Storage Project Management Center