Categorical Exclusion Determinations: B4.12

Rapid City Substation Dry Creek Substation Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Construction of the Rapid City-Dry 115 kilovolt Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Truckee Carson Irrigation District Hydro Project CX(s) Applied: B1.13, B4.12, B5.24 Date: 09/08/2014 Location(s): Nevada Offices(s): Golden Field Office Technology Office: Fuel Cell Technologies Award Number: DE-EE000084
Wray-Wray Tap 115-Kilovolt Transmission Line Construction CX(s) Applied: B4.12 Date: 02/28/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...
Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pinnacle Peak- Rogers 230-kilovolt Double Inset Structure Number 5/1 a installation CX(s) Applied: B4.12 Date: 06/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region