Categorical Exclusion Determinations: B4.11

St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...
Tucson Substation 162/262 Breaker Replacement CX(s) Applied: B3.1, B4.11 Date: 09/05/2012 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region
Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region