Categorical Exclusion Determinations: B2.5

Install Photovoltaic Roof System, Energy Efficiency Retrofits, Building Audits, and Hire a CommitteeCX(s) Applied: A9, A11, B2.5, B3.6, B5.1Date: 12/17/2009Location(s): Merrimack, New HampshireOffice(s): Energy Efficiency and Renewable Energy
Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic LightsCX(s) Applied: A1, A8, A11, B2.5, B5.1Date: 12/17/2009Location(s): Bridgeport, ConnecticutOffice(s): Energy Efficiency and Renewable Energy
Energy Efficiency Lighting and Plumbing Retrofits for Several City FacilitiesCX(s) Applied: B2.5, B5.1Date: 12/17/2009Location(s): Porterville, CaliforniaOffice(s): Energy Efficiency and Renewable Energy
Energy Efficiency (EE) and Conservation Strategy, and EE RetrofitsCX(s) Applied: A9, A11, B2.5, B5.1Date: 12/16/2009Location(s): Hillsborough, New HampshireOffice(s): Energy Efficiency and Renewable Energy
Establish a Sustainability Office and Heating, Ventilation, Air Conditioning UpgradesCX(s) Applied: A1, B2.5, B5.1Date: 12/16/2009Location(s): Lakeland, FloridaOffice(s): Energy Efficiency and Renewable Energy