Categorical Exclusion Determinations: B1.6

Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.6 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Installation or Modification of Retention Tanks and Small Basins to Control Runoff and SpillsCX(s) Applied: B1.6Date: 06/20/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Curecanti Substation Containment Wall, Montrose County, ColoradoCX(s) Applied: B1.6Date: 05/19/2011Location(s): Montrose County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region
Center of Excellence in Watershed Applications and Technology-Based Economic Revitalization (WATER)CX(s) Applied: B1.6, B1.15, B5.1Date: 10/05/2010Location(s): IllinoisOffice(s): Science, Chicago Office
Installation and Operation of the North Plateau Full Scale Permeable Treatment WallCX(s) Applied: B1.6, B1.13, B6.1, B6.9Date: 06/28/2010Location(s): West Valley, New YorkOffice(s): West Valley Demonstration Project