Categorical Exclusion Determinations: B1.5

Cleaning of the L4 Pump House Galley, Trash Rack, Concrete Inlet Channel and Settling Tank CX(s) Applied: B1.3, B1.5 Date: 08/21/2003 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Utility Energy Service Contract Closed Loop Centrifugal Chiller at the Central Chilled Water Facility CX(s) Applied: B1.5, B2.1 Date: 07/10/2012 Location(s): New York Offices(s): Brookhaven Site Office
Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5 Date: 06/08/2012 Location(s): Illinois Offices(s): New Br...
285-H Cooling Tower Basin Well Water Makeup Supply BypassCX(s) Applied: B1.5Date: 09/16/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, National Energy Technology Laboratory
Building 1, 25, and 26 Chiller Design and ReplacementCX(s) Applied: B1.3, B1.4, B1.5Date: 08/08/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
221-F Canyon Truckwell Heating, Ventilation, and Air Conditioning SystemCX(s) Applied: B1.5Date: 08/01/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
221-F Canyon Truckwell Heating, Ventilation, and Air Conditioning SystemCX(s) Applied: B1.5Date: 07/29/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
840 Chilled Water - Capital Equipment PurchaseCX(s) Applied: B1.5Date: 07/05/2011Location(s): Albuquerque, New MexicoOffice(s): NNSA-Headquarters, National Energy Technology Laboratory
North Carolina Green Business Fund ? Kyma TechnologiesCX(s) Applied: A1, B1.4, B1.5, B5.1Date: 04/18/2011Location(s): North CarolinaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory