Categorical Exclusion Determinations: B1.3

Isolate 185-3K Cooling Tower Fire Water Leg from Area Firewater LoopCX(s) Applied: B1.3Date: 01/05/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Collection and Disposition of Hazardous Materials from the Process Buildings CX(s) Applied: B1.3, B1.27, B1.28, B2.1, B2.3, B2.5Date: 01/01/2010 Location(s): OhioOffices(s): Portsmouth Paducah Project Office
Removal of Excess DOE Material in the Process Buildings CX(s) Applied: B1.3, B1.27, B1.28, B2.1, B2.3, B2.5Date: 01/01/2010 Location(s): OhioOffices(s): Portsmouth Paducah Project Office
Cloud Radar, Balloon Launcher, Data System, Utility, and Road Upgrades for Atmospheric Radiation Measurement Climate Research Facility in Barrow, AlaskaCX(s) Applied: B1.3, B3.6, B4.13Date: 12/30/2009Location(s): Barrow, AlaskaOffice(s): Sandia Site Of...
Project Number MS-09-116 - Structural Assessment of Big Hill Raw Water Intake Structure, Big Hill Brine Disposal Pump Pad and Bryan Mound Raw Water Intake StructureCX(s) Applied: B1.3Date: 12/29/2009Location(s): TexasOffice(s): Fossil Energy, Strategic...
Project Number BM-10-165 - Blast and Paint Bryan Mound Heat ExchangersCX(s) Applied: B1.3Date: 12/29/2009Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Bellevue's Energy Efficiency Retrofits: Heating, Ventilating, and Air Conditioning Upgrade, Building Controls, Lighting, and Energy Efficiency RemodelingCX(s) Applied: B5.1, B1.3, B2.2, B2.5Date: 12/29/2009Location(s): Bellevue, NebraskaOffice(s): Ener...