Categorical Exclusion Determinations: B1.3

Building 1, 25, and 26 Chiller Design and ReplacementCX(s) Applied: B1.3, B1.4, B1.5Date: 08/08/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
Install a Portable Generator to Supply Electrical Power to the 241-74F Switchgear BusCX(s) Applied: B1.3Date: 08/03/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office