Categorical Exclusion Determinations: B1.3

Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration