Categorical Exclusion Determinations: B1.3

Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Savannah River National Laboratory (SRNL) Building 735-13A Heating, Ventilation and Air-Conditioning (HVAC) System Addition CX(s) Applied: B1.3 Date: 11/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Protection and Communication Facilities Maintenance CX(s) Applied: B1.3, B1.7, B1.19 Date: 11/08/2013 Location(s): Arizona, Nevada, California, Utah Offices(s): Western Area Power Administration-Desert Southwest Region