Categorical Exclusion Determinations: B1.3

254-19H Diesel Generator Dry Pipe Sprinkler Systems with Non-Continuous Obstructions CX(s) Applied: B1.3Date: 07/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area CX(s) Applied: B1.3Date: 07/17/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Remove Beaver Debris/Possibly Relocate Beavers from Stormwater Pond above Outfall N-15 CX(s) Applied: B1.3Date: 07/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office