Categorical Exclusion Determinations: B1.31

Project to "Establish a Muon Gyromagnetic Ratio Measurement (g-2) Experiment within the Muon Campus CX(s) Applied: B1.30, B1.31, B3.10 Date: 12/20/2012 Location(s): Illinois Offices(s): Fermi Site Office
Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8 Date: 12/19/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Washington River Protection Solutions LLC - Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Sologen Geothermal Co-Production Field Demonstration CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15 Date: 12/13/2012 Location(s): Texas Offices(s): Golden Field Office
Mission Support Alliance Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B1.31 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richlan...
In-Situ X-Ray Analysis of Rapid Thermal Processing for Thin-Fil Solar Cells CX(s) Applied: A9, B1.31, B3.6 Date: 11/21/2012 Location(s): California, Colorado Offices(s): Golden Field Office
Alterations to Existing Buildings, Construction of Small-Scale Support Structures, and Relocation of Machinery and Equipment CX(s) Applied: B1.11, B1.15, B1.31 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak R...
Alterations to Existing Buildings Construction of Small-Scale Support Structures and Relocation of Machinery and Equipment CX(s) Applied: B1.11; B1.15; B1.31 Date: 11/09/2012 Location(s): Tennessee, California, Virginia Offices(s): Berkeley Site Office