Categorical Exclusion Determinations: B1.15

Energy Systems Integration Facility Excavation Soil StockpileCX(s) Applied: B1.15Date: 04/12/2011Location(s): Golden, ColoradoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Maryland Clean Energy Center - Frostburg Hydroelectric ProjectCX(s) Applied: B1.15, B5.1Date: 04/01/2011Location(s): Frostburg, MarylandOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
New Double Wide Trailer Installation Adjacent to Trailer 704-16ZCX(s) Applied: B1.15Date: 03/31/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Installation of B-Area Weapons/Ammo Bunkers and Excavation to Install Electrical SupplyCX(s) Applied: B1.15Date: 03/28/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Upgrade Heating, Ventilation, and Air Conditioner Supply and D-119/120 Lab Mods, 735-ACX(s) Applied: B1.15Date: 03/28/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
South Table Mountain Complex and National Wind Technology Center Security UpgradesCX(s) Applied: B1.15Date: 03/10/2011Location(s): ColoradoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office