Categorical Exclusion Determinations: Arizona

Emergency Storm Damage Repairs to the Gila North Gila, Gila Knob, and Sonora San Luis Transmission Lines, near Yuma, Yuma County, Arizona CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert So...
Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Glen Canyon to Flagstaff #2 345-Kilovolt Transmission Line, Access Road Maintenance from Structure 45/5 to 46/1 CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Glen Canyon Substation Stage 09- 50MVA 230/69KV Transformer addition CX(s) Applied: B4.11 Date: 07/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Removal and replacement of Oracle Breakers 562 and 762 along with associated disconnects. CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Herbicide Application at 40 Substations Located in Arizona During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
"Herbicide Application at Two Substations: Kayenta and Long House Valley Located on the Navajo Nation During Fiscal
Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Reg...