Categorical Exclusion (CX) Determinations By Date

Project Number MS-09-116 - Structural Assessment of Big Hill Raw Water Intake Structure, Big Hill Brine Disposal Pump Pad and Bryan Mound Raw Water Intake StructureCX(s) Applied: B1.3Date: 12/29/2009Location(s): TexasOffice(s): Fossil Energy, Strategic...
Project Number BM-10-165 - Blast and Paint Bryan Mound Heat ExchangersCX(s) Applied: B1.3Date: 12/29/2009Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Pressure Sensor and Telemetry Methods for Measurement while Drilling in Geothermal WellsCX(s) Applied: A9, B3.6Date: 12/29/2009Location(s): New YorkOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Bellevue's Energy Efficiency Retrofits: Heating, Ventilating, and Air Conditioning Upgrade, Building Controls, Lighting, and Energy Efficiency RemodelingCX(s) Applied: B5.1, B1.3, B2.2, B2.5Date: 12/29/2009Location(s): Bellevue, NebraskaOffice(s): Ener...
Belleville's Energy Efficiency Retrofits on Municipal Buildings: Lighting, Window Replacement, and InsulationCX(s) Applied: B2.5, B5.1, B1.3Date: 12/29/2009Location(s): Belleville, IllinoisOffice(s): Energy Efficiency and Renewable Energy
Arlington's Replacement of Main Heating Plant Boiler at Arlington High SchoolCX(s) Applied: B2.5, B5.1, B1.3Date: 12/29/2009Location(s): Arlington, MassachusettsOffice(s): Energy Efficiency and Renewable Energy
Energy Efficiency Retrofits on Municipal Buildings: Lighting, Window Replacement, and Insulation CX(s) Applied: B1.3, B2.5, B5.1 Date: 12/29/2009 Location(s): Illinois Offices(s): Energy Efficiency and Renewable Energy
Tailored Working Fluids for Enhanced Binary Geothermal Power PlantsCX(s) Applied: A9, B3.6, B5.1Date: 12/28/2009Location(s): ConnecticutOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office