Summary
Bonneville Power Administration prepared an EA, issued and Finding of No Significant Impact (FONSI) and Mitigation Action Plan (MAP) for the Shelton-Fairmount Transmission Line Rebuild and Fiber Optic System Replacement Project (Proposed Action or Project) to replace aged wood-pole transmission structures, conductors, overhead ground wire and associated hardware, disconnect switching facilities, and upgrade or repair portions of the access roads to transmission line structures.
BPA website also relevant documents Shelton-Fairmount No 1 Transmission Line Rebuild Project (DOE/EA-2224).