Western Area Power Administration prepared Sterling Solar 2 Interconnection Project (DOE/EA-2141) for the proposed interconnection and project-related transmission system upgrades for the Sterling Solar 2, a proposed 225-megawatt photovoltaic generation facility on private land.
For more information, see Sterling Solar 2 Interconnection Project (wapa.gov).