Summary
This Environmental Assessment (EA) was prepared to fulfill the need for analysis of the Bryan Mound Raw Water Intake Structure (RWIS) Upgrades to Prevent Silt Buildup (work package BM-MM-1560) proposed action planned in support of the Strategic Petroleum Reserve Life Extension II (SPR LE-II) project.