DOE/EA-2079: Raw Water Intake Structure Channel Upgrades Project; Bryan Mound Strategic Petroleum Reserve, Texas

Summary

This Environmental Assessment (EA) was prepared to fulfill the need for analysis of the Bryan Mound Raw Water Intake Structure (RWIS) Upgrades to Prevent Silt Buildup (work package BM-MM-1560) proposed action planned in support of the Strategic Petroleum Reserve Life Extension II (SPR LE-II) project.