Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center.
Documents Available for Download
-
The Western Area Power Administration proposes a 5-year formula rate extension through March 31, 2030 that is unchanged from the existing Rate Sche…
-
The Western Area Power Administration proposes a 5-year formula rate extension through June 7, 2029, in accordance with 10 CFR 903.23(a).…
-
The SLCA/IP consists of the CRSP units and its participating projects, Dolores and Seedskadee, as well as two small individual projects, Rio Grande…
-
Power from the Colorado River Storage Project (CRSP) will be provided for facilities of the Navajo Gallup Project, specifically, the San Juan Later…