EIS-0414: Record of Decision

Energia Sierra Juarez Transmission Project

Office of NEPA Policy and Compliance

August 17, 2012
minute read time

Energia Sierra Juarez Transmission Project

 

DOE announces its decision to issue a Presidential permit to Energia Sierra Juarez U.S. Transmission, LLC (ESJ), to construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line across the U.S.-Mexico border in eastern San Diego County, California. The potential environmental impacts associated with the transmission line are analyzed in the Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project (DOE/EIS–0414). The transmission line would originate at San Diego Gas and Electric’s planned East County Substation (ECO Substation), and extend southward approximately 0.65 miles to the U.S. border with Mexico, near Jacumba, California, where it would cross the border and connect with a transmission line to be built in Mexico.