EA-1478: Finding of No Significant Impact

Hoover Dam Bypass Project Phase II, Nevada

Office of NEPA Policy and Compliance

October 27, 2003
minute read time

Hoover Dam Bypass Project Phase II, Nevada

Western Area Power Administration proposes to double-circuit a portion of the Hoover Dam Bypass Project PHase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV Transmission Line. In addition, a fiber optic cable would be placed as an overhead ground wire on the double-circuited transmission lines form the area of Hoover Dam to Mead Substation.