Draft DOE/EIS-0270 (December 1997) for accelerator production of tritium at the Savannah River Site.
Office of NEPA Policy and Compliance
December 19, 1997Accelerator Production of Tritium at the Savannah River Site
DOE issued Draft Accelerator Production of Tritium at the Savannah River Site (DOE/EIS-0270), which evaluates the potential environmental impacts of alternatives for siting, constructing, and operating an accelerator for tritium production at the Savannah River Site.
For more information, see Accelerator Production of Tritium at the Savannah River Site.