Analyzes a proposal to construct, connect, operate, and maintain a 5-mile-long 138-kV and 230-kV alternating current electric transmission system.
Office of NEPA Policy and Compliance
July 1, 2017Nogales Interconnection Project; Nogales, Arizona
DOE prepared a draft environmental assessment (DOE/EA-2042) for the Nogales Interconnection Project.
For more information, see Nogales Interconnection Project.