The Project is a rebuild of six (6), 161 kV overhead transmission lines from the Gridliance Joppa 161 kV switchyard to the TVA Shawnee Station and LGE Grahamville 161 kV substations.
Office of NEPA Policy and Compliance
August 31, 2023The Project is a rebuild of six (6), 161 kV overhead transmission lines from the Gridliance Joppa 161 kV switchyard to the TVA Shawnee Station and LGE Grahamville 161 kV substations.