CX-270666: Outfall (OF-001) National Pollutant Discharge Elimination System (NPDES) Detention Basin Project

The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001

Office of NEPA Policy and Compliance

May 31, 2022
minute read time

The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001).

CX-270666.pdf (983.15 KB)