The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
Office of NEPA Policy and Compliance
March 5, 2020The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project will include the removal of sediment that has accumulated directly upstream of a culvert that feeds Outfall 005, followed by the installation of a permanent rip rap apron with a stone check dam before the culvert.