CX-032178: Climate Adaptation Resilience Program

Planned activities consists of additions or modifications to electric power facilities within previously disturbed or developed facility areas,incl…

Office of NEPA Policy and Compliance

September 20, 2024
minute read time

Planned activities consists of additions or modifications to electric power facilities within previously disturbed or developed facility areas,including replacement poles along limited egress roadways (SOPO tasks 11 and 18), replacement of distribution overhead lines and poles (SOPO tasks 12 and 19), and removal of hazard trees (SOPO task 21).