The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the repl…
Office of NEPA Policy and Compliance
October 23, 2024The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the replacement of additional electrical interface equipment located inside an existing hydro electric power house.