The U.S. Department of Energy (DOE) is proposing to provide funding to the City of Portage to install a 159.90-kilowatt (kW) rooftop solar array on…
Office of NEPA Policy and Compliance
September 16, 2024The U.S. Department of Energy (DOE) is proposing to provide funding to the City of Portage to install a 159.90-kilowatt (kW) rooftop solar array on the Portage City Hall located at 7900 South Westnedge Avenue, Portage, Michigan 49002-5117.