Upgrade the city's main backbone looped junctions, terminations, cable/conduit, and switches, replace the 35 kV submarine cable, connect generators…
Office of NEPA Policy and Compliance
September 12, 2024Upgrade the city's main backbone looped junctions, terminations, cable/conduit, and switches, replace the 35 kV submarine cable, connect generators to the City's grid network, install level protections.