It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
Office of NEPA Policy and Compliance
August 15, 2024It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide power for welding machines and miscellaneous hand power tools. This MT will permanently install cable within conduit that will connect to Motor Control Centers (MCC) T160-600-4 and T160-600-5, located in Building 233-H.