CX-031779: Construction Temporary Power for Building 233-H

It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…

Office of NEPA Policy and Compliance

August 15, 2024
minute read time

It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide power for welding machines and miscellaneous hand power tools. This MT will permanently install cable within conduit that will connect to Motor Control Centers (MCC) T160-600-4 and T160-600-5, located in Building 233-H.