CX-031512: 13.8kV Substation to Power 233-H Main Supply Air Handling Unit (U)

This EEC cover the Project design and Procurement of a new 13.8 kV Unit Substation to be situated near the existing 233-H Supply Fan Air Handling U…

Office of NEPA Policy and Compliance

July 3, 2024
minute read time

This EEC cover the Project design and Procurement of a new 13.8 kV Unit Substation to be situated near the existing 233-H Supply Fan Air Handling Unit (AHU). The new substation will require a new electrical supply circuit run from Transmission Line 3A to the new Unit Substation location.