Bonneville Power Administration (BPA) proposes to allow Umatilla Electric Cooperative (UEC) to construct, operate, and maintain a new 5.6-mile-long…

Office of NEPA Policy and Compliance

July 19, 2024
minute read time

Bonneville Power Administration (BPA) proposes to allow Umatilla Electric Cooperative (UEC) to construct, operate, and maintain a new 5.6-mile-long 230-kV double circuit transmission line and accompanying pole towers on BPA fee-owned rights-of-way between the BPA McNary Substation to the UEC Wanapa Substation.