CX-031480: Snohomish Public Utility District Battery Energy Storage System Interconnection (Update to May 29, 2024, CX)

The Bonneville Power Administration (BPA) proposes to install wiring for telemetry equipment in BPA’s Snohomish Substation and perform associated p…

Office of NEPA Policy and Compliance

July 11, 2024
minute read time

The Bonneville Power Administration (BPA) proposes to install wiring for telemetry equipment in BPA’s Snohomish Substation and perform associated programming in BPA’s control center to interconnect the Snohomish Public Utility District (PUD) 25 MW large generator interconnection battery energy storage system (BESS) request.