Extend 138kV transmission line from new 138kV Nortonville Switchyard to new 138kV/46kV North Substation Number 3 (total 13,200 feet). A 138kV ring …
Office of NEPA Policy and Compliance
July 11, 2024Extend 138kV transmission line from new 138kV Nortonville Switchyard to new 138kV/46kV North Substation Number 3 (total 13,200 feet). A 138kV ring bus will be installed at Nortonville interconnect.