1.Reconfigure 41 miles of power line insulators 2. Reconductor 23 miles of transmission line 3. Relocate 2.1 miles of overhead conductors…
Office of NEPA Policy and Compliance
July 24, 20241.Reconfigure 41 miles of power line insulators 2. Reconductor 23 miles of transmission line 3. Relocate 2.1 miles of overhead conductors