CX-031273: Install PAR Systems Modifications for TEF Remote Handling Area Crane

The TEF Remote Handling Area (RHA) Crane has a scenario where radioactive material is being handled by the crane and a failure causes the inability…

Office of NEPA Policy and Compliance

June 18, 2024
minute read time

The TEF Remote Handling Area (RHA) Crane has a scenario where radioactive material is being handled by the crane and a failure causes the inability to place the radioactive load in a safe state. SRTE has requested PAR Systems Engineering to determine system modifications in order to recover from a hydraulic unit/hose failure scenario.