The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ballard US Inc. (Ballard) to install a membrane electrode assembly (…

Office of NEPA Policy and Compliance

June 18, 2024
minute read time

The U.S. Department of Energy (DOE) is proposing to provide federal funding to Ballard US Inc. (Ballard) to install a membrane electrode assembly (MEA) manufacturing line, stack assembly line, and factory acceptance testing (FAT) operation within their Rockwall Gigafactory facility in Rockwall, Texas, which is in the early stages of construction. Construction of the Rockwall Gigafactory is not being funded by DOE and is not considered a connected action.