BPA proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (kV) transmission line from Stevens…
Office of NEPA Policy and Compliance
June 13, 2024BPA proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (kV) transmission line from Stevens Drive Substation south to the Richland Substation within the City of Richland, Washington (see enclosed project map).