CX-030717: Surplus Plutonium Disposition (SPD) Project N-Area Support Buildings

With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fab…

Office of NEPA Policy and Compliance

April 23, 2024
minute read time

With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fabric tension structure (Quonset hut) will be installed in N-area.