The following scope of work will consist of paving a parking lot of approx. 14,800 ft2 east of Technical Area 54 (TA-54) Operations Center (buildin…
Office of NEPA Policy and Compliance
March 19, 2024The following scope of work will consist of paving a parking lot of approx. 14,800 ft2 east of Technical Area 54 (TA-54) Operations Center (building TA-54-315), which is currently a gravel-covered dirt parking area. The paving will greatly reduce the potential for slips, trips, or falls within the area.