Bonneville Power Administration (BPA) proposes to repair and improve access roads along the Driscoll-Naselle 115-kV No. 1 transmission line between…

Office of NEPA Policy and Compliance

February 23, 2024
minute read time

Bonneville Power Administration (BPA) proposes to repair and improve access roads along the Driscoll-Naselle 115-kV No. 1 transmission line between structures 17/2-18/3.